2023/11/01


PROJECT PROPOSAL

For the installation of

44.00 kWp (DC)


44.00 KW (AC)

Commercial Grid Tied
Solar Photovoltaic System


Proposed To:

Dakota De Freitas

curated by:

Solar Watt Systems

Terms & Conditions

Please read these terms and conditions carefully in conjunction with our proposal for the design, supply, and installation of the solar photovoltaic system. These terms outline the essential aspects of our agreement and provide important information related to the project. 

Brief Description

Our proposal entails the comprehensive design, supply, and professional installation of a solar photovoltaic system at the specified location. This system will be meticulously configured to ensure optimum performance, efficiency, and environmental sustainability. Following the successful setup of the electric circuit components, Solar Watt Systems Inc will diligently commission the system, provide the Owner's Instructions Manual, and offer comprehensive explanations of the PV System's essential functions. We are committed to delivering a seamless and efficient solar solution tailored to your specific needs. 

By accepting our proposal, you agree to adhere to the terms and conditions outlined herein. Should you have any questions or require further information.

1

Estimate Returns on Investment (ROI) (Combined kWp total)

Please read these terms and conditions carefully in conjunction with our proposal for the design, supply, and installation of the solar photovoltaic system. These terms outline the essential aspects of our agreement and provide important information related to the project. 

Year FCA PV Recovery RATE
($/kWh)
Credit from Utility
1 $0.2000 $0.3575 $11,070.56
2 $0.2000 $0.3575 $11,015.21
3 $0.2000 $0.3575 $10,959.85
4 $0.2000 $0.3575 $10,904.50
5 $0.2000 $0.3575 $10,849.15
6 $0.2000 $0.3575 $10,793.80
7 $0.2000 $0.3575 $10,738.44
8 $0.2000 $0.3575 $10,683.09
9 $0.2000 $0.3575 $10,627.74
10 $0.2000 $0.3575 $10,572.38
11 $0.2000 $0.3575 $10,517.03
12 $0.2000 $0.3575 $10,461.68
13 $0.2000 $0.3575 $10,406.33
14 $0.2000 $0.3575 $10,350.97
15 $0.2000 $0.3575 $10,295.62
16 $0.2000 $0.3575 $10,240.27
17 $0.2000 $0.3575 $10,184.91
18 $0.2000 $0.3575 $10,129.56
19 $0.2000 $0.3575 $10,074.21
20 $0.2000 $0.3575 $10,018.86
Totals $210,894.16
Ave Annual return (IRR) over 20 years 18.28%
Payback (Years) 5.15
1
  • Values do not represent guarantees of system performance.
  • Reasonable attempts have been made to model real world system performance.
  • Solar Watt Systems Inc. will not be held liable for discrepancy in actual system performance.
  • Solar Watt Systems inc. will not be held liable for discrepancies in any of the calculations listed above.
  • All values should be reviewed with a qualified tax professional.
  • All Incentives, Grants, and Tax Credits are subject to availability by issuing authority.
  • Use caution when interpreting the Internal Rate of Return Values - this calculation does not take into account your cost of capital or reinvestment rate.
  • ELPA License expires after two years and is subject to renewal.

The Fair Trading Commission (FTC) is responsible for determining the rates per kilowatt-hours therefore some fluctuations can be expected overtime. However, the current annual estimated saving is calculated based upon the FTC’s energy rate of BBD $ 0.4275 per kWh. 

Application Fee Insurance of Licence Fee Application Category Rate Applicable
$500.00 Domestic $100.00 From 0 kW - Up to 10kW
(Threshold where minimum
application documentation
required as per the ELPA
Application Form, Items 3 - 4 )
$0.3575

Please write all cheques to the Permanent Secretary, Ministry of Energy & Business Development. The Ministry does not accept abbreviations.

1

Performance

Yield Values are based on the specifications provided by the manufacturer of the installed equipment and the capacity of the inverter. If, after the project completion and the PV system's commissioning, the yield values fall below the estimated 45kWhrs in the first year, the contractor will take all required corrective measures, including the installation of additional equipment at their own expense to ensure the required output. 

Solar Watt shall not be held accountable for the following conditions, as they are beyond our control: 

  • Values do not represent guarantees of system performance.
  • Reasonable attempts have been made to model real world system performance.
  • Solar Watt Systems Inc. will not be held liable for discrepancy in actual system performance.
  • Solar Watt Systems inc. will not be held liable for discrepancies in any of the calculations listed above.
  • All values should be reviewed with a qualified tax professional.
  • All Incentives, Grants, and Tax Credits are subject to availability by issuing authority.
  • Use caution when interpreting the Internal Rate of Return Values - this calculation does not take into account your cost of capital or reinvestment rate.
  • ELPA License expires after two years and is subject to renewal.
1

Warranty

  • The PV panels have a manufacturer's linear power warranty for 25 years and a product warranty for 12 years.
  • SMA inverters have a manufacturer warranty of 10 years, with an optional extension available at an additional cost.
  • The PV mounting system has a manufacturer warranty of 10 years, while the monitoring device has a manufacturer warranty of 2 years. 
  • Workmanship and labour are warranted for 1 year after the installation date, excluding any Acts of God. Please note that warranties are provided by the manufacturers, not Solar Watt Systems Inc. 

While Solar Watt Systems can assist with warranty transactions, it's important to be aware that freight charges, removal, and reinstallation are not covered under the manufacturer's guarantee agreements. The attached warranty documents from the individual manufacturers provide more details. Any costs for equipment replacement outside the warranty period will be absorbed by the customer, and diagnostic analysis call-outs will incur additional charges. 

Insurance

As we proceed with the arrangements for your solar system installation, we highly recommend consulting with your insurance company to ensure comprehensive coverage for your investment in case of any damages.

Please note that Solar Watt Systems Inc's insurance responsibility concludes once the components of the PV system have been delivered to the site and/or partially installed on your property, even if the system has not been commissioned yet. Therefore, it is in the best interest of the Client to have the system insured to safeguard against unfortunate situations or Acts of God.

1

Termination Clauses

The contract may be terminated by either party under the following circumstances:

  • If the Contractor suspends the project or a significant portion of the project or abandons the project for a period exceeding seven days (7), without the approval of the Client, except in cases of force majeure events.
  • If the Client fails to make payment for any amount under this contract for a period exceeding fourteen days (14), from the day the payment becomes due, with the exception of any amount(s) due but disputed between the parties.
  • If the Contractor fails to obtain or maintain permits and approvals necessary for the successful execution of the project.
  • If either party becomes bankrupt or applies for bankruptcy or is placed into bankruptcy.
  • Either party may terminate this contract immediately if the other party breaches any provisions of this contract, and such breach continues for a period of seven (7) days following written notice of the breach to the breaching party.
  • In the event of termination of this contract by the Contractor due to default by the Client, the Client agrees to pay all outstanding invoices at termination for works performed prior to termination, except for any invoice(s) subject to dispute between the parties.
  • In the event of termination of this contract by the Client due to default by the Contractor, the Contractor agrees to refund the Client for works not completed up to the termination date. If materials were purchased for the project, the Client is required to pay the full costs for the materials, and the Contractor will hand over all materials to the Client upon receipt of this payment.
  • Either party has the right to terminate this contract without reason upon providing no less than thirty (30) days' advance notice to the other party. In the event of termination for convenience by the Client, the Contractor shall be paid for all work correctly completed and invoiced up to the termination date, except for any invoice(s) subject to dispute between the parties. In the event of termination by the Contractor, the Contractor shall repay and/or refund any overpayments or advance payments made by the Client for works not yet completed as of the termination date.
  • The Client agrees to pay the Contractor in full for all equipment purchased for this Project within thirty days (30), should the Contract be terminated due to no fault of the Contractor.
1

Force Majeure Clause

  • Neither Party shall be held liable for the full or partial non-performance of their obligations under this Agreement if such non-performance is a result of circumstances of Force Majeure. Events of force majeure include, but are not limited to, strikes, lockouts, fire, storm, flood, earthquake, war, rebellion, governmental law or restrictions, and any circumstances beyond the control of the contracting parties that arise after the contract's conclusion.
  • If any force majeure circumstances directly affect the fulfilment and performance of either party's obligations during the term of this Agreement, the term shall be extended for the duration of the force majeure.
  • In the event of force majeure circumstances prevailing for more than sixty days (60), the Parties shall have the right, mutually or individually, to partially or completely terminate this Contract without prejudice to any sums owing for any part performance rendered under this Agreement.

Secretary Departments' Approval

  • In compliance with the Laws of Barbados, a PV Licence from the Ministry of Energy is mandatory. Additionally, approvals from the Government Electrical Engineering Department (GEED) and the Barbados Light and Power Company Limited (BL&P) are also required.
  • Solar Watt Systems will handle the submission of all Applications on behalf of the Client, but necessary supporting documents must be provided by the Client to facilitate the installation process. The Applications will be forwarded to the Electric Light and Power Advisory Committee (ELPAC) for their recommendations to the Minister.
  • Upon receiving the planning decision, the applicant will be issued either an approval or refusal through the online system. In the case of approval, the applicant is required to make the license fee payment, and upon acceptance, the PV License will be issued through the system.
1

Owner's Responsibility (For Roof-Mounted Systems)

  • In the event of any Builders' work exceeding the estimated cost, the Client shall make separate payments accordingly.
  • The Client shall ensure the provision of a wired communication port to enable connectivity to the inverters and facilitate web monitoring of the system.
  • The premises must be fully compliant with all relevant electrical standards for the successful installation and operation of the PV system.
  • The Client shall bear the cost of any necessary upgrades required for the optimal functioning of the Owner's electrical system, essential for the efficient operation of the PV system.
  • The Client shall ensure that the installation site is safe and suitable for Solar Watt Systems staff to carry out the installation process.
  • The Client must provide Public Liability insurance coverage of $100,000 for RGS (Renewable Generation System) up to 10 kW and $500,000 for RGS greater than 10kW.
  • The Client shall sign and submit all necessary documents for approvals from the Statutory Department, and Solar Watt Systems will collaborate in providing these documents for your convenience.
1

Operations & Maintenance (O&M)

We highly recommend and are pleased to offer operation and maintenance (O&M) services to the Client for a minimum of two (2) years following project completion. It is crucial to note that the Manufacturers’ warranty may become null and void if the PV system is serviced by others or if the recommended service procedures by the Manufacturer are not adhered to. Our comprehensive scope of works for O&M services includes:

  • Removing all debris from the surface of the panels, thereby ensuring the efficiency of the PV
    System.
  • Servicing and inspecting the fans from the inverters before re-installation.
  • Verifying all AC & DC connections on the inverters to ensure proper contact.
  • Checking the polarity of the cables to ensure they are suitable for carrying the required electric load of the PV System.
  • Recording all DC Voltages and Amperes of the PV System for performance monitoring.
  • Evaluating the strength of the PV strings using an Analyzer to identify various fault modes and locate electrical issues.
  • Our half-yearly estimated cost per service is $806.99 V.A.T. inclusive, providing you with reliable and professional maintenance to safeguard your PV system's performance and maximize its lifespan.
1

Contractor's Responsibility

  • The quote includes a high-quality steel sub-frame engineered for roof-mounted racking, capable of withstanding gusts of 150mph (3-seconds).
  • DC cables from the Grid-Tied Photovoltaic Array will be routed back to the proposed inverter area upon completion of the panel array installation.
  • The estimated completion and commissioning time is approximately forty weeks (40), subject to weather conditions and procurement schedule, while grid-connected projects must undergo the interconnection process with the BL&P, which may cause delays.
  • Electrical set-up and builders' work costs will be tracked separately, with any achieved savings passed on to the Client. Other costs beyond the provisional sum will be the Client's responsibility, plus 8.5%.
  • The installation period follows a work schedule from Monday to Thursday, 8:00 am - 4:30 pm, and on Friday from 8:00 am to 3:15 pm, excluding bank holidays. Unforeseen circumstances beyond our control may require additional time to complete the job.
  • The quote includes web monitoring equipment, allowing remote monitoring of the PV System's performance from anywhere in the world. Daily updates will be sent via email, providing information on your CO2 reductions and savings.

Delivery

  • The anticipated delivery of Solar Panels and Inverters to the site is expected within 6 - 8 weeks, subject to stock availability.
1

Pricing, Validity & Payment Terms

Equipment Schedule

Description Quantity
solar panels 3

Quantities are subject to change based on availability, design consideration and site restrictions.

Ownership & Payment

The ownership of the system will be transferred to the customer upon full payment. However, Solar Watt Systems Inc. (SWSI) retains the right to remove the system in the event of non-payment, at the cost of the customer.

Certification of Electrical Installation

Upon successful completion of the installation, the Government Electrical Engineering Department (GEED) will issue a Certificate of Approval, confirming that the PV System has been installed to their satisfaction and meets their requirements.

Testing & Commissioning

On-site testing and commissioning of the PV System installation is conducted to verify compliance with the manufacturer's specifications and to ensure the system's operational readiness for subsequent metre changeover. The installation is considered complete and functional once the GEED approval certificate is received, and the system is activated.

1

Scope fo Works(SOW)

Solar Watt Systems will provide the following services:

  • System Design and Engineering.
  • Supply of all project-related materials, including but not limited to PV modules, inverters, mounting systems and control panels.
  • Technical support and documentation for statutory and regulatory approvals.
  • Civil activities, such as foundation, cable trenches, pedestal, and cable conduit fittings, transformer pad.
  • Supply and installation of new service load equipment, including panel boards, lighting, and outlets.
  • Supply and installation of communication cables and monitoring devices for inverters only.
  • Supply and installation of electrical and miscellaneous items.
  • AC and DC wiring, including combiner boxes.
  • Commissioning of PV installation and electrical works.

Exclusions from Solar Watt Systems' Scope of Works:

  • Cutting or trimming of trees nearby the installation area to avoid shading.
  • Supply or installation of internet connections from the source to the inverters.
  • The associated costs with BL&P for interconnections.
1

Acceptance

I hereby confirm that I have thoroughly read, understood, and consent to all the terms and conditions outlined in this document, along with all attachments. I acknowledge that upon affixing my signature, this document shall constitute a legally binding contract.

1

Method of Payment

We encourage that payment be made by cheque or debit funds transfer, using the following information: